Kitchen Remodel Timeline

What to expect when going through a kitchen remodel.

Demolition- One day
  • Timing depends on who you choose to complete demolition. Hiring a professional often ensures your old kitchen is gone in just one day! (these jobs can vary depending on the size of the project)
Renovations- One-two weeks
  • This is the time to open walls for electrical and plumbing work. Fixing your walls and completing your flooring are the next steps.
Patch, paint, and new flooring- One week
  • After patching your sheetrock or plaster, paint your walls. Minor touchups will need to be completed later. Most flooring can be installed this point (floating floor should be installed after cabinets.)
Services Provided by IKEA
Cabinet installation: two-three days
  • Installation depends on the scope of work, number of cabinets, and existing wall materials in your home
Custom Countertop installation- Two-three weeks (from date of purchase to date of install)
  • The time frame from countertop template to install depends on vendor chosen and the time of year. IKEA solid wood and laminate countertops are able to be installed during cabinet installation. Custom countertops are installed through a third party.
Final connection of plumbing and electrical- One week
  • After the countertops are installed, complete the backsplash, final plumbing, and electrical. Appliance hook up depends on the safety and suitability of the connections.
Punchlist- One week
  • This is when you complete paint touch-ups, remove remaining debris, and deep clean your kitchen
 
*The underlined services IKEA offer.

What particular parts of our articles do you find unsatisfactory or unhelpful?

The text is confusing to understand

The text is not relevant to my question

The text is relevant but not helpful

The text is too long or too short

Thank you for your feedback!