Skip to main content

Bathroom installation

A professional bathroom installation can save you valuable time, especially for work such as the connection of water, waste and electricity systems. Our installation service coordinates all the necessary work and deals with all difficult tasks, such as the installation of taps and showers.

Installation of ENHET and NYSJÖN bathrooms

  • Wall cabinets – assembly of cabinets, mounting and levelling; assembly of hinges, doors, shelves, interior fittings, handles and knobs; including all connecting material, as well as material not included in IKEA packages.
  • Base cabinets – assembly of cabinets, mounting and levelling, assembly of legs, hinges, doors, drawers, shelves, interior fittings, handles and knobs, assembly of top panels, cutting of cabinets/top panels for installation of water systems; including all connecting material, as well as material not included in IKEA packages.
  • High cabinets – assembly of cabinets, mounting and levelling; assembly of legs, hinges, doors, drawers, shelves, interior fittings, handles and knobs; including all connecting material, as well as material not included in IKEA packages.
  • Separate worktop – installation of separately provided worktop You pay for the installation of the separately provided worktop only in case you haven´t ordered the installation of the whole bathroom.
  • Wash-basin and tap unit – installation of was-basin and tap unit according to IKEA instructions for prepared waste and water plumbing, including drilling of apertures in the worktop and threading.
  • Installation of lights – installation of lights according to IKEA instructions for prepared electrical connections.
  • Atypical tasks – billed per 15 minutes.

Installation of GODMORGON and HEMNES bathrooms

  • Wall cabinets – assembly of cabinets, mounting and levelling; assembly of hinges, doors, shelves, interior fittings, handles and knobs; including all connecting material, as well as material not included in IKEA packages. If two rows of cabinets are installed on top of one another, each row is counted separately.
  • Base cabinets – assembly of cabinets, mounting and levelling, assembly of legs, hinges, doors, drawers, shelves, interior fittings, handles and knobs, assembly of top panels, cutting of cabinets or the worktop for installation of water systems; including all connecting material, as well as material not included in IKEA packages.
  • High cabinets – assembly of cabinets, mounting and levelling; assembly of legs, hinges, doors, drawers, shelves, interior fittings, handles and knobs, connecting and finishing strips; including all connecting material, as well as material not included in IKEA packages.
  • Separate worktop – installation of separately provided worktop. You pay for the installation of the separately provided top panel only in case you haven´t ordered the installation of the whole bathroom.
  • Wash-basin and tap unit – installation of the wash-basin and tap unit according to IKEA instructions for prepared waste and water plumbing, including drilling of apertures in the worktop and threading.
  • Installation of lights – installation of lights according to IKEA instructions for prepared electrical connections.
  • Atypical tasks – billed per 15 minutes.